InFuse · AI-assisted delivery
Deliver what was signed.
InFuse holds an implementation’s SOW, requirements, designs, tests and issues as linked records. AI drafts each record from the approved ones before it, and a person approves every draft.
Before InFuse
Seven documents. None of them agree.
SOW, FRS, workbook, FDS, test scripts, issue register, user guides. Each is rewritten by hand from the one before it and falls out of step within the week. Scope gets argued by re-reading all seven.
Decision D-031 on 12 Sep changed how forecast at completion treats pending change orders. Which of these seven files says so?
P1 · Source to requirements
AI drafts. Your consultants decide.
Load the RFP and the SOW. InFuse proposes requirements, each citing the clause it came from, and holds every one as a draft until a consultant accepts, edits or rejects it.
23 requirements proposed
AI draft · pending
System shall lock cost periods monthly after finance close.
SOW says “period controls” without frequency; RFP Q-118 says monthly.
Requirements workbook
286 requirements. Each has a source.
High-level and detailed requirements in one grid, quick enough to type into during a workshop. When a decision changes, the nine records it touched are flagged for review instead of drifting.
9 need review after last week’s decision
Traceability
One requirement, linked both ways.
REQ-CM-014 points back to SOW §3.2.4 and forward to the screen, field, formula, use case and test that carry it. Change it and every linked record is marked for review.
Forecast at completion recalculates when an approved change order posts.
Detailed · Functional · Must
- Source
- SOW §3.2.4
- Screen
- Cost Breakdown Grid
- Field
fac_amount· calculated- Formula
FAC = Actuals + ETC + Approved CO value- Use case
- UC-CM-06
- Tested by
- TS-CM-06 FAT · not run
- Decision
- D-031 12 Sep
FAC includes pending COs only after approval.
D-031 · settled 12 Sep
P4 · Scope check
Out of scope. Here is the clause.
Jonas Becker asked for a portfolio roll-up across EUR, GBP and NOK. InFuse quoted the two SOW clauses that exclude it and drafted CR-012. A person confirms each verdict, one at a time.
Jonas Becker · workshop, 29 Sep
Portfolio dashboard should roll up costs across EUR, GBP and NOK.
Out of scope
Proposed by P4 · confirmed one at a time, by a person
Route: chargeable change request CR-012
6 days · EUR 9,600 at the rate card
P8 · Wireframes
Wireframes in the product they bought.
InFuse learns Octave Sequence’s look from reference screenshots and draws the Cost Breakdown Grid in it, wired to the requirements and fields it implements. Revise it by typing an instruction.
Notes on FAC
REQ-CM-014 FAC = Actuals + ETC + Approved CO value · D-031
1 shared comment from Hartwell, pinned to FAC
Customer portal
Your customer signs in the same place.
Dr. Katrin Vogel sees what needs her, what is late and which change orders wait, on one page. She reads a published snapshot, never your working draft, and signs with a one-time code.
Hartwell Capital Projects Controls, Phase 1 · with Meridian Delivery Partners
Three things need you this week. One is due tomorrow.
Decide by Tue 6 OctReview and approve
12 screens · review by 8 OctReview
on the published FDSOpen
- Order value
- EUR 653,200 · PO and three change orders
- In your review
- CR-010 CR-011
Revisions and baselines
What did we agree? Compare it.
Every field keeps its history. Baselines are taken at the SOW, the signed FRS, the signed FDS and as built, so the question gets a comparison instead of a meeting.
Baselines
signed FRS v1.0
14 Sep FDS
due 8 Oct As built
after build
Formula · field history
FAC = Actuals + ETC + CO value
FAC = Actuals + ETC + Approved CO value
Priya Raman · 12 Sep · D-031
Locked in the FRS v1.0 baseline, signed by Hartwell on 14 Sep
Design partners
Run your next project on InFuse.
We are taking three to five implementation firms as design partners, at half price for the first year. Start with thirty days on the Hartwell sample project.
Thirty days on the Hartwell sample project, then one live project of your own.
- The sample
- Meridian Delivery Partners implementing Octave Sequence 9.2 for Hartwell Energy AG
- In it
- 286 requirements · 11 change requests · a signed FRS
- Design partners
- Three to five firms · 50% off the first year
- To start
- No payment details